AVAILABILITY

Available to consumers for all types of usage, subject to the established rules and regulations of the Cooperative.  The maximum transformer capacity allowed for single-phase service shall be 100 kVA.

TYPE OF SERVICE

Single phase, 60 cycles, at available secondary voltages.

MONTHLY RATE

Facility Charge................................................................ $33.00

Energy Charge:

First 600 kWh.............................................................. $0.130 per kWh

Over 600 kWh............................................................. $0.086 per kWh

For consumers receiving a water heater credit for allowing the Cooperative to control their electric water heater, the monthly rate shall apply along with a credit of 1.0¢ per kWh for the first 400 kWh in excess of the first 300 kWh per month applied to the monthly bill.  For consumers with more than one controlled water heater, a credit of 1.0¢ per kWh for the first 800 kWh in excess of the first 300 kWh per month will be applied to the monthly bill.  Only controlled water heaters with tank capacity of 50 gallons or more shall qualify for this credit.

MINIMUM CHARGES

The Cooperative shall determine the minimum monthly charge based on one of the following methods:

  1. The minimum monthly charge specified in the contract for service.
  2. A charge of $1.20 per kVA of required transformer capacity.
  3. The monthly facility charge, as shown above.

MINIMUM ANNUAL CHARGES

Unless otherwise stated in the contract for service, a consumer may guarantee a minimum annual charge, in which case, there shall be no minimum monthly charge.  The minimum charge shall be sufficient to assure adequate compensation for facilities installed to serve the load and, in no event, shall it be less than twelve times the minimum monthly charge determined in accordance with the foregoing paragraph.

PURCHASED POWER COST ADJUSTMENT CHARGE

The energy charge is subject to upward or downward adjustment to reflect variations in purchased power costs.

STATE AND MUNICIPAL TAXES

All applicable state and municipal sales tax and any other non-ad valorem taxes imposed on electric energy sales shall be applied to monthly bills rendered under this rate schedule unless the consumer is exempt from said tax or taxes.

TERMS OF PAYMENT

In the event the current monthly bill is not paid in accordance with the payment dates indicated on the bill, a late payment penalty in effect at the time shall apply.

This rate schedule supersedes rate schedule GS-1 adopted April 21, 2016.

EFFECTIVE DATE: May 2017 billing period