Southeastern Electric Cooperative is accepting applications for three (3) Utility Assistants to work with line crews constructing and maintaining electric utility distribution voltage lines. Hourly rate. No benefits. Openings will be available at three of our six office locations with employment beginning in May 2025. Graduation from vocational/technical school in power line studies required. Experience in electric utility line construction and maintenance may be substituted for vocational/technical education. Must have a commercial driver’s license (CDL) or be able to obtain a CDL within 30 days of employment. Applications will be accepted until filled.
Southeastern belongs to an alliance of more than 750 Touchstone Energy cooperatives in 46 states. Touchstone Energy provides a unified face for the small businesses that own and service rural America’s 2.5 million miles of power line. By working jointly, this network of small co-ops generate services that would normally require the resources of a national corporation.
Touchstone Energy co-ops are owned by the members they serve and are committed to providing reliable electricity at the lowest price possible. In short, co-ops “look out” for the members they serve.
The Cooperative is an Equal Opportunity Employer. In compliance with the Americans with Disabilities Act, the Cooperative will provide reasonable accommodations to qualified individuals with disabilities and encourage both prospective and current employees to discuss potential accommodations with the employer.
Equal Opportunity Employer, including disabled and veterans.
Click here to read the full job description.
Click here to download the application. Please upload completed application below.
2025 Utility Assistant Application
"*" indicates required fields